logo
03 58 311 112
24/7 Service Please Call

Scope of works: Installation of all new air handling unit, screw compressor package, and rooftop condenser.

  • Complete overhaul of HVAC system.
  • Removal of R22 water cooled system and cooling tower.
  • Installation of state of the art air cooled R134a Bitzer CSH ComMECH screw package.
  • Installation of new GJ Walker air handling unit with:
    • 2 stage DX cooling coil
    • 1st stage heat reclaim
    • 2nd stage HHW coil
  • HHW supplied from high efficiency natural gas boiler.